Due to obtaining new contracts, the client required to optimize their plant layout.

They commissioned partners to help them integrate multiple processes on a single station, increasing the efficiency of the plant area usage.

LG AUTOMATION delivered a design concept and feasibility analysis for the implementation of an index table.

Afterwards, mechanical design was done in under 2 weeks, and manufacturing was finalized completely inhouse in under 5 weeks. And integration in 4 weeks, for a total of 12 weeks (shipping included)

The station was able to operate multiple bushing operations such as:

  • Pick and place
  • Flattening
  • Flange forming